This page is designed to illustrate the results
of 5 weeks of Pro-E training and countless lab hours
dedicated to the speedy production of a manufactured part.
With the limitation of a 3x3x1 inch workspace, we sought to be innovative but not infeasible with our design.
Inspired by the poor weather conditions, we decided to
build a beach with palm trees.